“Kisan Urja Suraksha Evam Utthan Mahabhiyan (KUSUM)” Scheme
While Large Scale Solar power generation projects are being installed to achieve the ambitious target of 100 GW of Solar Power generation by 2022, it has been planned to simultaneously develop decentralized Solar energy and other renewable energy generation Plants of capacity up to 2 MW which could be connected directly to existing 33/11 kV or 66/11 kV or 110/11 kV sub-stations of Distribution Company, thus saving in transmission system requirement apart from T&D losses. Such plants near these sub-stations may be developed, preferably by farmers, giving them an opportunity to increase their income by utilising their barren and uncultivable land for solar or other renewable energy based power plants. Cultivable land may also be used if the Solar plants are set up on stilts where crops can be grown below the stilts and sell RE power to DISCOMs.